Search Result...

     

Results of your browse: in Type. Total 1312 Results  
<<    1 |  2 |  3 |  4 |  5 |  6 |  7 |  8 |  9 |  10 |  11 |  12 |  13 | 14 |  15 |  16 |  17 |  18 |  19 |  20 |  21 |  22 |  23 |  24 |  25 |  26 |  27 |  28 |  29 |  30 |  31 |  32 |  33 |  34 |  35 |  36 |  37 |  38 |  39 |  40 |  41 |  42 |  43 |  44 |  45 |  46 |  47 |  48 |  49 |  50 |  51 |  52 |  53 |    >>
Back
 
301  De-motivation among Vietnamese oil and gas offshore staff-causes and solutions
Author: Quach Trong Thang
Callnumber:
 
302  Dealing with employee turnover : a case study of the Research and Development Centere for Petroleum Safty and Environment (RDCPSE)
Author: Do Son Huong
Callnumber:
 
303  Delay analysis in EPC power plant project : a case study of Vung Ang 1 Power Plant Project
Author: Dang Trung Kien
Callnumber: AIT Proj. no.MPM-CM-16-15
 
304  Delay analysis in power plant construction projects Of Vietnam Electricity (EVN)
Author: Nguyen Hong Quang
Callnumber:
 
305  Delay and cost overrun of EPC projects : a case study of Cai Gia desalination plant
Author: Nguyen Le Nhat Vu
Callnumber: AIT Proj no.MPM-CM-21-08
 
306  Delay causations in construction : a case study of pipeline projects
Author: Nguyen Anh Dao
Callnumber: AIT Proj. no.CM-08-12
 
307  Delay causations in water supply projects in Dong Nai Province, Vietnam : a lesson learned from Nhon Trach Water Supply Project
Author: Vo Hoang Phuong
Callnumber: AIT Proj no.CM-08-09
 
308  Delay causes in sub-projects of the Ho Chi Minh National Highway Construction Project : a case study of the road construction connecting the Ho Chi Minh highway to the Lan Ong commemorative area
Author: Nguyen Dinh Duong
Callnumber: AIT Proj. no.CM-09-35
 
309  Delay causes in the construction of the refinery projects in Vietnam : a case study on the Dung Quat Refinery Project
Author: Nguyen Thi Thu Huong
Callnumber: AIT Proj. no.CM-09-39
 
310  Delay in expressway infrastructure construction in Vietnam : a case study of Da Nang-Quy Nhon expressway project
Author: Doan Ngoc Hung
Callnumber: AIT Proj. no.MPM-CM-20-06
 
311  Delay in planning, design and construction: a case study of residential development project in Ho Chi Minh City
Author: Nguyen Hung Cuong
Callnumber: AIT Proj. no.MPM-CM-10-17
 
312  Delay risk management in high-voltage power network projects at the Southern part of Vietnam : a case study of 220KV Duyen Hai Power Center - Travinh transmission line
Author: Phan Nguyen Hoai Anh
Callnumber: AIT Proj. no.MPM-CM-15-19
 
313  Delays and claims in hydropower plant project : a case study of Dong Nai 4 Hydropower Plant Project
Author: Tran Cao Hy
Callnumber: AIT Proj. no.MPM-CM-11-35
 
314  Delays in construction projects in Vietnam : a case study of last Section of National Highway no. 51
Author: Truong Quang Dien
Callnumber: AIT Proj. no.CM-09-23
 
315  Delays in flood prevention projects : a case study of urban drainage project management unit
Author: Le Do
Callnumber: AIT Proj. no.MPM-CM-11-20
 
316  Design a roadmap for the technology transfer from astek to Embedded System Division (EMB) at Global Cybersoft, Inc.
Author: Lam Hong Le Ly
Callnumber:
 
317  Design management and integrated design approach in hospital project : a case study of 1000 beds hospital project in Binh Duong New City
Author: Le Duy Luc
Callnumber: AIT Proj. no.MPM-CM-14-28
 
318  Design management for architectural project : a case study fo PVMTC : Petrovietnam Building Project
Author: Dang Dinh Lam
Callnumber: AIT Proj. no.CM-09-02
 
319  Design management for design and build of a building project : a case study of M-One Building Projects
Author: Huynh Ha Trieu
Callnumber: AIT Proj. no.MPM-CM-16-18
 
320  Design management for design consultant : a case study of Sonasea Vandon Resort project
Author: Nguyen Tri
Callnumber: AIT Proj. no.MPM-CM-20-09
 
321  Design management for increasing efficiency in apartment project : a case study of Thuwanna Apartment Project in Yangon City, Myanmar
Author: Nguyen Cao Minh Dung
Callnumber: AIT Proj. no.MPM-CM-16-22
 
322  Design management for urban planning project : a case study of residential commercial area Vifonland in Ho Chi Minh
Author: Nguyen Quoc Anh
Callnumber: AIT Proj. no.MPM-CM-20-05
 
323  Design management in design-build project base on design team of contractor perspective
Author: Nguyen Cao Bao Luat
Callnumber: AIT Proj no.MPM-CM-10-30
 
324  Design management in infrastructure project : a case study of the Phu My 3 Project
Author: Nguyen Nong Troung Thanh
Callnumber: AIT Proj. no.MPM-CM-12-05
 
325  Design management in metro project : case study in station design adjustment of metro line 2, Ben Thanh - Tham Luong
Author: Nguyen Dang Anh Tu
Callnumber: AIT Proj. no.MPM-CM-14-27